FP7H2020HORIZON
Proigmenes Erevnitikes & Diahiristikes Efarmoges
- Country
- GRGreece
- Defence projects
- 0
- Projects, all programmes
- 14
- As coordinator
- 0
- EU contribution (CORDIS)
- EUR 4,687,304
- Active
- 2012 to 2022
Projects
14 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| INPERSOINdustrialised and PErsonalised Renovation for Sustainable sOcieties | HORIZON | 2022 | Participant | EUR 821,625 |
| TransZeroWasteUpgrading of low-quality iron ores and mill scale with low carbon technologies | HORIZON | 2022 | Participant | EUR 207,750 |
| REHOUSERenovation packagEs for HOlistic improvement of EU’s bUildingS Efficiency, maximizing RES generation and cost-effectiveness | HORIZON | 2022 | Participant | EUR 669,238 |
| SurefitSUSTAINABLE SOLUTIONS FOR AFFORDABLE RETROFIT OF DOMESTIC BUILDINGS | H2020 | 2020 | Participant | EUR 331,888 |
| PLURALPLUG-AND-USE RENOVATION WITH ADAPTABLE LIGHTWEIGHT SYSTEMS | H2020 | 2020 | Participant | EUR 680,006 |
| POWERSKIN PLUSHighly advanced modular integration of insulation, energising and storage systems for non-residential buildings | H2020 | 2019 | Participant | EUR 270,025 |
| EnDurCreteNew Environmental friendly and Durable conCrete, integrating industrial by-products and hybrid systems, for civil, industrial and offshore applications – EnDurCrete | H2020 | 2018 | Participant | EUR 280,633 |
| InnoWEEInnovative pre-fabricated components including different waste construction materials reducing building energy and minimising environmental impacts | H2020 | 2016 | Participant | EUR 458,750 |
| BRIMEECost-effective and sustainable Bio-Renewable Indoor Materials with high potential for customisation and creative design in Energy Efficient buildings | FP7 | 2013 | Participant | EUR 229,200 |
| COMMONENERGYre-conceptualize shopping malls from consumerism to energy conservation | FP7 | 2013 | Participant | EUR 276,600 |
| CONSTRUCT-PVConstructing buildings with customizable size PV modules integrated in the opaque part of the building skin | FP7 | 2013 | Participant | Not stated |
| LEEMALow Embodied Energy Advanced (Novel) Insulation Materials and Insulating Masonry Components for Energy Efficient Buildings | FP7 | 2012 | Participant | EUR 106,870 |
| EFFESUSENERGY EFFICIENCY FOR EU HISTORIC DISTRICTS SUSTAINABILITY | FP7 | 2012 | Participant | EUR 143,520 |
| RETROKITRetroKit - Toolboxes for systemic retrofitting | FP7 | 2012 | Participant | EUR 211,200 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.