H2020HORIZONFP7
Enel Green Power SpA
- Country
- ITItaly
- Defence projects
- 0
- Projects, all programmes
- 26
- As coordinator
- 3
- EU contribution (CORDIS)
- EUR 21,069,720
- Active
- 2012 to 2023
Projects
26 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| NanowingsNANOmetric bio-inspired coating for wind turbine WINGS ice protection | HORIZON | 2023 | Participant | EUR 431,375 |
| VALHALLAPerovskite solar cells with enhanced stability and applicability | HORIZON | 2023 | Participant | Not stated |
| SUSTAINEXTNEXT GENERATION, ZERO-WASTE, DYNAMIC, MULTIVALORIZATION ROUTE BIOREFINERY FOR SUSTAINABLE BOTANICAL INGREDIENTS:SHOWCASING A REPLICABLE AND VERSATILE MODEL FROM EXTREMADURA TO BIO-BASED INDUSTRY IN EU | HORIZON | 2023 | Participant | EUR 143,250 |
| WENDYMulticriteria analysis of the technical, environmental and social factors triggering the PIMBY principle for Wind technologies | HORIZON | 2022 | Participant | EUR 414,375 |
| PHOTORAMAPHOtovoltaic waste management – advanced Technologies for recOvery and recycling of secondary RAw MAterials from end-of-life modules | H2020 | 2021 | Participant | EUR 702,581 |
| EU-SCORESEuropean Scalable Complementary Offshore Renewable Energy Sources | H2020 | 2021 | Participant | EUR 665,624 |
| TRUST-PVIncrease Friendly Integration of Reliable PV plants considering different market segments | H2020 | 2020 | Participant | EUR 1,169,788 |
| GrapheneCore3Graphene Flagship Core Project 3 | H2020 | 2020 | Participant | EUR 206,046 |
| PV ImpactActual execution of the Implementation Plan for Photovoltaics and monitoring the Implementation Plan’s delivery | H2020 | 2019 | Participant | EUR 76,156 |
| REMOTERemote area Energy supply with Multiple Options for integrated hydrogen-based TEchnologies | H2020 | 2018 | Participant | EUR 78,040 |
| GEOENVITackling the environmental concerns for deploying geothermal energy in Europe | H2020 | 2018 | Participant | EUR 100,000 |
| MANUELAAdditive Manufacturing using Metal Pilot Line | H2020 | 2018 | Participant | EUR 79,581 |
| GOPVGlobal Optimization of integrated PhotoVoltaics system for low electricity cost | H2020 | 2018 | Participant | EUR 1,294,563 |
| OSMOSEOptimal System-Mix Of flexibility Solutions for European electricity | H2020 | 2018 | Participant | EUR 512,772 |
| DTOceanPlusAdvanced Design Tools for Ocean Energy Systems Innovation, Development and Deployment | H2020 | 2018 | Participant | EUR 79,844 |
| GrapheneCore2Graphene Flagship Core Project 2 | H2020 | 2018 | Participant | EUR 0 |
| ReSHEALienceRethinking coastal defence and Green-Energy Service infrastructures through enHancEd-durAbiLIty high-performance fiber reinforced cement-based materials. | H2020 | 2018 | Participant | EUR 582,115 |
| AMPEREAutomated photovoltaic cell and Module industrial Production to regain and secure European Renewable Energy market | H2020 | 2017 | Coordinator | EUR 8,765,433 |
| PECSYSTechnology demonstration of large-scale photo-electrochemical system for solar hydrogen production | H2020 | 2017 | Participant | EUR 185,339 |
| CL-WindconClosed Loop Wind Farm Control | H2020 | 2016 | Participant | EUR 150,125 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.