FP7H2020HORIZON
Acciona Construccion SA
- Country
- ESSpain
- Defence projects
- 0
- Projects, all programmes
- 212
- As coordinator
- 18
- EU contribution (CORDIS)
- EUR 65,231,422
- Active
- 2008 to 2025
Projects
212 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| FC-DISTRICTNew µ-CHP network technologies for energy efficient and sustainable districts | FP7 | 2010 | Participant | EUR 424,840 |
| FIEMSERFriendly Intelligent Energy Management System for Existing Residential Buildings | FP7 | 2010 | Participant | EUR 235,500 |
| PLANTCockpitProduction Logistics and Sustainability Cockpit | FP7 | 2010 | Participant | EUR 229,883 |
| NANOPCMNew Advanced iNsulatiOn Phase Change Materials | FP7 | 2010 | Coordinator | EUR 780,350 |
| ENERGY WARDENDesign and real time energy sourcing decisions in buildings | FP7 | 2010 | Participant | EUR 386,040 |
| OPEN HOUSEOPEN HOUSE - Benchmarking and mainstreaming building sustainability on the EU based on transparency and openness (open source and availability) from model to implementation | FP7 | 2010 | Coordinator | EUR 350,035 |
| CILECCTAA user-oriented, knowledge-based suite of Construction Industry LifE Cycle CosT Analysis (CILECCTA) software for pan-European determination and costing of sustainable project options | FP7 | 2009 | Participant | EUR 228,400 |
| MESSIBMulti-source Energy Storage System Integrated in Buildings | FP7 | 2009 | Coordinator | EUR 1,094,676 |
| CESARCost-Efficient Methods and Processes for Safety Relevant Embedded Systems | FP7 | 2009 | Participant | EUR 170,841 |
| CP-ESFRCollaborative Project on European Sodium Fast Reactor | FP7 | 2009 | Participant | EUR 21,000 |
| NANOCOMLowering Barriers for Nanotechnology Commercialisation via Open Innovation | FP7 | 2009 | Participant | EUR 83,428 |
| PIME'SCONCERTO communities towards optimal thermal and electrical efficiency of buildings and districts, based on MICROGRIDS | FP7 | 2009 | Participant | Not stated |
| TRANS-INDIntegrated cost-effective construction process for transport infrastructures, based on a flexible industrialisation of FRP components | FP7 | 2009 | Participant | EUR 558,000 |
| EU2010_R2SInternational Conference of the Spanish EU Presidency 2010. The European Framework Programme: from Recovery to Sustainability | FP7 | 2009 | Participant | EUR 118,801 |
| CONTACTMarie Curie Initial Training Network for the tailored supply-chain development of the mechanical and electrical properties of CNT-filled composites | FP7 | 2009 | Participant | EUR 282,572 |
| FLOODPROBETechnologies for the cost-effective Flood Protection of the Built Environment | FP7 | 2009 | Participant | EUR 97,000 |
| CLIMATE FOR CULTUREDamage risk assessment, economic impact and mitigation strategies for sustainable preservation of cultural heritage in the times of climate change | FP7 | 2009 | Participant | EUR 153,450 |
| IREMOintelligent REactive polymer composites MOulding | FP7 | 2009 | Participant | EUR 414,000 |
| EXPERLEfficient exploitation of EU perlite resources for the development of a new generation of innovative and high added value micro-perlite based materials for Chemical, Construction and Manufacturing | FP7 | 2009 | Participant | EUR 311,000 |
| SOFIASmart Objects For Intelligent Applications | FP7 | 2009 | Participant | EUR 97,177 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.