FP7H2020HORIZON
Acciona Construccion SA
- Country
- ESSpain
- Defence projects
- 0
- Projects, all programmes
- 212
- As coordinator
- 18
- EU contribution (CORDIS)
- EUR 65,231,422
- Active
- 2008 to 2025
Projects
212 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| HEPHAESTUSHighly automatEd PHysical Achievements and PerformancES using cable roboTs Unique Systems | H2020 | 2017 | Participant | EUR 315,438 |
| ALADDINAdvanced hoListic Adverse Drone Detection, Identification Neutralization | H2020 | 2017 | Participant | EUR 108,750 |
| BARBARABiopolymers with advanced functionalities for building and automotive parts processed through additive manufacturing | H2020 | 2017 | Participant | EUR 0 |
| MASTROIntelligent bulk MAterials for Smart TRanspOrt industries. | H2020 | 2017 | Coordinator | EUR 814,430 |
| NewSOLNew StOrage Latent and sensible concept for high efficient CSP Plants | H2020 | 2017 | Participant | EUR 253,104 |
| CLARITYIntegrated Climate Adaptation Service Tools for Improving Resilience Measure Efficiency | H2020 | 2017 | Participant | EUR 24,011 |
| URBAN GreenUPNew Strategy for Re-Naturing Cities through Nature-Based Solutions | H2020 | 2017 | Participant | EUR 32,162 |
| ROCKRegeneration and Optimisation of Cultural heritage in creative and Knowledge cities | H2020 | 2017 | Participant | EUR 255,544 |
| E2DistrictEnergy Efficient Optimised District Heating and Cooling | H2020 | 2016 | Participant | EUR 135,826 |
| LORCENISLong Lasting Reinforced Concrete for Energy Infrastructure under Severe Operating Conditions | H2020 | 2016 | Participant | EUR 562,375 |
| SmartEnCityTowards Smart Zero CO2 Cities across Europe | H2020 | 2016 | Participant | EUR 216,056 |
| Nature4CitiesNature Based Solutions for re-naturing cities: knowledge diffusion and decision support platform through new collaborative models | H2020 | 2016 | Participant | EUR 74,250 |
| RAGTIMERisk based approaches for Asset inteGrity multimodal Transport Infrastructure ManagEment | H2020 | 2016 | Participant | EUR 246,250 |
| RE4REuse and REcycling of CDW materials and structures in energy efficient pREfabricated elements for building REfurbishment and construction | H2020 | 2016 | Participant | EUR 495,000 |
| IN2SMARTIntelligent Innovative Smart Maintenance of Assets by integRated Technologies | H2020 | 2016 | Participant | EUR 53,328 |
| KRAKENHybrid automated machine integrating concurrent manufacturing processes, increasing the production volume of functional on-demand using high multi-material deposition rates | H2020 | 2016 | Participant | EUR 282,000 |
| HEAT-SHIELDIntegrated inter-sector framework to increase the thermal resilience of European workers in the context of global warming | H2020 | 2016 | Participant | EUR 127,813 |
| IN2TRACKResearch into enhanced tracks, switches and structures | H2020 | 2016 | Participant | EUR 168,873 |
| GREEN INSTRUCTGreen Integrated Structural Elements for Retrofitting and New Construction of Buildings | H2020 | 2016 | Participant | EUR 175,313 |
| LOWUPLOW valued energy sources UPgrading for buildings and industry uses | H2020 | 2016 | Coordinator | EUR 547,625 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.