H2020HORIZONFP7
Airbus
- Country
- FRFrance
- Projects
- 105
- As coordinator
- 13
- EU contribution (CORDIS)
- EUR 106,004,267
- Active
- 2007 to 2025
Projects
105 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| PACIFICParticle emissions, Air Quality and Climate Impact related to Fuel Composition and Engine Cycle | HORIZON | 2025 | Third party | Not stated |
| GOLIATGround Operations of LIquid hydrogen AircrafT | HORIZON | 2024 | Coordinator | EUR 1,859,112 |
| TROPHYTechnological Research On Propulsion by HYdrogen | HORIZON | 2024 | Participant | EUR 917,263 |
| COMPANIONCOMmon Platform and Advanced INstrumentation ReadIness for ultra efficient propulsion demonstratiON | HORIZON | 2024 | Third party | Not stated |
| ECOHYDROECONOMIC MANUFACTURING PROCESS OF RECYCLABLE COMPOSITE MATERIALS FOR DURABLE HYDROGEN STORAGE | HORIZON | 2024 | Participant | EUR 120,024 |
| HYLENAHYdrogen eLectrical Engine Novel Architecture | HORIZON | 2024 | Coordinator | EUR 468,319 |
| ATC-TBOAir Traffic Control Trajectory Based Operations | HORIZON | 2023 | Participant | EUR 92,750 |
| GEESEGain Environmental Efficiency by Saving Energy | HORIZON | 2023 | Coordinator | EUR 777,000 |
| CONCERTOConstruction Of Novel CERTification methOds and means of compliance for disruptive technologies | HORIZON | 2023 | Participant | EUR 370,214 |
| NETWORK TBONetwork Trajectory Based Operations | HORIZON | 2023 | Participant | EUR 1,092,194 |
| Green-GEARGreen operations with Geometric altitude, Advanced separation and Route charging Solutions | HORIZON | 2023 | Participant | EUR 13,750 |
| CICONIAClimate effects reduced by Innovative Concept of Operations - Needs and Impacts Assessment | HORIZON | 2023 | Coordinator | EUR 617,750 |
| SMR ACAPSMR aircraft architecture and technology integration project | HORIZON | 2023 | Participant | EUR 3,277,102 |
| GALAADGreen Aviation – Lean Arrivals And Dynamicity | HORIZON | 2023 | Participant | EUR 88,375 |
| SOLOSingle pilOt Line Operations | HORIZON | 2023 | Coordinator | EUR 527,770 |
| SWITCHSustainable Water-Injecting Turbofan Comprising Hybrid-electrics | HORIZON | 2023 | Third party | Not stated |
| PEARLPerformance Estimation, Assessment, Reporting and simuLation | HORIZON | 2023 | Participant | EUR 263,813 |
| FASTER-H2Fuselage, Rear Fuselage and Empennage with Cabin and Cargo Architecture Solution validation and Technologies for H2 integration | HORIZON | 2023 | Third party | Not stated |
| AMPLE3SESAR3 ATM Master Planning and Monitoring | HORIZON | 2023 | Participant | EUR 263,375 |
| FCDIFuture Connectivity and Digital Infrastructure | HORIZON | 2023 | Participant | EUR 99,834 |
The country is the one the source records for the organisation’s registration (its PIC). A body with sites in several countries is recorded under one of them, which is not always its legal seat: the Spanish research council CSIC, for example, appears under Italy. The data holds no country per site, so we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.