FP7H2020HORIZON
Centro Europeo di Formazione e Ricerca in Ingegneria Sismica
- Country
- ITItaly
- Defence projects
- 0
- Projects, all programmes
- 21
- As coordinator
- 0
- EU contribution (CORDIS)
- EUR 6,599,721
- Active
- 2008 to 2022
Projects
21 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| RAISEResearch Analysis Identifier SystEm | HORIZON | 2022 | Participant | EUR 178,875 |
| TeamAwareTeam Awareness Enhanced with Artificial Intelligence and Augmented Reality | H2020 | 2021 | Participant | EUR 306,722 |
| Drones4SafetyInspection Drones for Ensuring Safety in Transport Infrastructures | H2020 | 2020 | Participant | EUR 326,434 |
| SIXTHSENSESmart integrated extreme environment health monitor with sensory feedback for enhanced situation awareness | H2020 | 2020 | Participant | EUR 358,750 |
| TURNkeyTowards more Earthquake-resilient Urban Societies through a Multi-sensor-based Information System enabling Earthquake Forecasting, Early Warning and Rapid Response actions | H2020 | 2019 | Participant | EUR 524,250 |
| RISEReal-time Earthquake Risk Reduction for a Resilient Europe | H2020 | 2019 | Participant | EUR 430,000 |
| SERASeismology and Earthquake Engineering Research Infrastructure Alliance for Europe | H2020 | 2017 | Participant | EUR 970,000 |
| LIQUEFACTAssessment and mitigation of liquefaction potential across Europe: a holistic approach to protect structures / infrastructures for improved resilience to earthquake-induced liquefaction disasters | H2020 | 2016 | Third party | Not stated |
| ICARUSIntegrated Climate forcing and Air pollution Reduction in Urban Systems | H2020 | 2016 | Participant | EUR 434,063 |
| EPOS IPEPOS Implementation Phase | H2020 | 2015 | Participant | EUR 95,000 |
| SENSUMFramework to integrate Space-based and in-situ sENSing for dynamic vUlnerability and recovery Monitoring | FP7 | 2013 | Participant | EUR 326,840 |
| RASORRapid Analysis and Spatialisation Of Risk (RASOR) | FP7 | 2013 | Participant | EUR 117,520 |
| STRESTHarmonized approach to stress tests for critical infrastructures against natural hazards | FP7 | 2013 | Participant | EUR 251,500 |
| MARSITENew Directions in Seismic Hazard assessment through Focused Earth Observation in the Marmara Supersite | FP7 | 2012 | Participant | EUR 58,320 |
| SASPARMSupport Action for Strengthening Palestinian-administrated Areas capabilities for Seismic Risk Mitigation | FP7 | 2012 | Participant | EUR 232,992 |
| REAKTStrategies and tools for Real Time EArthquake RisK ReducTion | FP7 | 2011 | Participant | EUR 250,860 |
| NERANetwork of European Research Infrastructures for Earthquake Risk Assessment and Mitigation | FP7 | 2010 | Participant | EUR 415,000 |
| SAFERServices and Applications For Emergency Response | FP7 | 2009 | Participant | EUR 74,660 |
| SERIESSEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES | FP7 | 2009 | Participant | EUR 622,100 |
| E-FASTDesign Study of a European Facility for Advanced Seismic Testing | FP7 | 2008 | Participant | EUR 422,662 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.