FP7H2020HORIZONEDF
Dnv As
- Country
- NONorway
- Projects
- 61
- As coordinator
- 1
- EU contribution (CORDIS)
- EUR 12,478,441
- Active
- 2008 to 2025
Projects
61 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| ECO2Sub-seabed CO2 Storage: Impact on Marine Ecosystems (ECO2) | FP7 | 2011 | Participant | EUR 333,361 |
| CARTCooperative Autonomous Robotic Towing system | FP7 | 2011 | Participant | EUR 1,142 |
| OSLOOcean Surface Layer Observations | FP7 | 2011 | Participant | Not stated |
| COCATELarge-scale CCS Transportation infrastructure in Europe | FP7 | 2010 | Participant | EUR 499,999 |
| SUPERGREENSupporting EU’s Freight Transport Logistics Action Plan on Green Corridors Issues | FP7 | 2010 | Participant | Not stated |
| EXTREME SEASDesign for Ship Safety in Extreme Seas | FP7 | 2009 | Coordinator | EUR 527,050 |
| NANODEVICENovel Concepts, Methods, and Technologies for the Production of Portable, Easy-to-Use Devices for the Measurement and Analysis of Airborne Engineered Nanoparticles in Workplace Air | FP7 | 2009 | Participant | EUR 181,468 |
| PULSE STREAM 1200Full scale demonstration prototype tidal stream generator | FP7 | 2009 | Participant | Not stated |
| BESSTBreakthrough in European Ship and Shipbuilding Technologies | FP7 | 2009 | Participant | EUR 142,387 |
| BIOCOR ITNInitial training network on biocorrosion | FP7 | 2009 | Participant | EUR 346,688 |
| FLOODSTANDIntegrated Flooding Control and Standard for Stability and Crises Management | FP7 | 2009 | Participant | EUR 37,012 |
| GOALDSGOAL Based Damage Stability | FP7 | 2009 | Participant | EUR 278,915 |
| CASMARECoordination Action to maintain and further develop a Sustainable MAritime Research in Europe | FP7 | 2009 | Participant | EUR 102,818 |
| NAVTRONICNavigational system for efficient maritime transport | FP7 | 2009 | Participant | EUR 450,414 |
| POSE²IDONPower Optimised Ship for Environment with Electric Innovative Designs ON board | FP7 | 2009 | Participant | EUR 243,400 |
| EXCITINGExact Geometry Simulation for Optimized Design of Vehicles and Vessels | FP7 | 2008 | Participant | EUR 268,515 |
| INTEG-RISKEarly Recognition, Monitoring and Integrated Management of Emerging, New Technology Related Risks | FP7 | 2008 | Participant | EUR 167,997 |
| EQUIMAREquitable Testing and Evaluation of Marine Energy Extraction Devices in terms of Performance, Cost and Environmental Impact | FP7 | 2008 | Participant | EUR 185,500 |
| H2SUSBUILDDevelopment of a clean and energy self-sustained building in the vision of integrating H2 economy with renewable energy sources | FP7 | 2008 | Participant | EUR 180,895 |
| SECTRONICSecurity System for Maritime Infrastructures, Ports and Coastal zones | FP7 | 2008 | Participant | EUR 184,004 |
The country is the one the source records for the organisation’s registration (its PIC). A body with sites in several countries is recorded under one of them, which is not always its legal seat: the Spanish research council CSIC, for example, appears under Italy. The data holds no country per site, so we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.European Defence Fund participants are read from the project factsheets that DG DEFIS publishes, by a language model; every name is checked against the factsheet text and a name that is not in it is dropped. The factsheets state no amount per participant.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.