EDF
Safran Electronics & Defense
- Country
- FRFrance
- Projects
- 33
- As coordinator
- 3
- EU contribution (CORDIS)
- Not stated
- Active
- 2021 to 2025
Projects
33 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| ABYSSAAdvanced Breakthrough sYstems for SubSea Autonomy | EDF | 2025 | Participant | Not stated |
| DARTDigital Architecture Framework for SoS Readiness and Digital Twin Integration | EDF | 2025 | Participant | Not stated |
| ACHILE 2Augmented Capability for HIgh end soLdiErs 2 | EDF | 2025 | Coordinator | Not stated |
| TRIDENTNext generaTion Resilient long-range European Counter-Battery system via heterogeneous Sensor fusion, AI-enhanced Decision support and firE coNTrol | EDF | 2025 | Participant | Not stated |
| LATACC2LAnd TActical Collaborative Combat Phase 2 | EDF | 2025 | Participant | Not stated |
| FAMOUS3European Future Highly Mobile Augmented Armoured Systems 3 | EDF | 2025 | Participant | Not stated |
| EURODAMMEuropean Drone-Based Affordable Mass Munitions | EDF | 2025 | Participant | Not stated |
| EURECAEUropean REsilient Chiplet Architecture | EDF | 2025 | Participant | Not stated |
| STRATUSSwarm Threat Resilience and Adaptive Tactical UxV Security | EDF | 2025 | Participant | Not stated |
| BATTLEVERSEA Human-Centred MSaaS Ecosystem for Enhanced Mission Planning and Execution via Battlefield Modelling, Adversarial AI, and Multi-domain Simulation Environments | EDF | 2024 | Participant | Not stated |
| iMUGS2Integrated Modular Unmanned Ground System 2 | EDF | 2024 | Participant | Not stated |
| AURIGAArmoURed Infantry Ground Assault | EDF | 2024 | Participant | Not stated |
| ENGRT IIEuropean Next Generation Rotorcraft Technologies Phase II | EDF | 2024 | Participant | Not stated |
| E-CUASEuropean Counter Unmanned Aerial Systems | EDF | 2023 | Participant | Not stated |
| CARMENTA PFCARMENTA PRIMUM FUGA | EDF | 2023 | Participant | Not stated |
| NG-MIMANext Generation Military Integrated Modular Avionics | EDF | 2023 | Participant | Not stated |
| EUDAAS2European Detect & Avoid System, phase 2 | EDF | 2023 | Participant | Not stated |
| ACTUSAdvanced capabilities & Certification for Tactical UAV Systems | EDF | 2023 | Participant | Not stated |
| FMBTechTechnologies for existing and Future MBTs | EDF | 2023 | Participant | Not stated |
| ESOCAEuropean System for Outsized Cargo Airlift (ESOCA) | EDF | 2023 | Participant | Not stated |
The country is the one the source records for the organisation’s registration (its PIC). A body with sites in several countries is recorded under one of them, which is not always its legal seat: the Spanish research council CSIC, for example, appears under Italy. The data holds no country per site, so we do not guess.
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.European Defence Fund participants are read from the project factsheets that DG DEFIS publishes, by a language model; every name is checked against the factsheet text and a name that is not in it is dropped. The factsheets state no amount per participant.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.