H2020HORIZONFP7
Schweizerische Bundesbahnen Sbb
- Country
- CHSwitzerland
- Defence projects
- 0
- Projects, all programmes
- 22
- As coordinator
- 0
- EU contribution (CORDIS)
- EUR 895,695
- Active
- 2009 to 2025
Projects
22 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| MOVEOIntelligent Framework for Inclusive and Seamless Transport Infrastructure and Mobility Services | HORIZON | 2025 | Associated partner | EUR 0 |
| GridForLoadsGrid Forming Loads to provide maximum flexibility and enable future power systems with very high renewable generation penetration | HORIZON | 2025 | Associated partner | EUR 0 |
| FP2-MORANE-2Flagship project 2 - MObile radio for RAilway Networks in Europe 2 | HORIZON | 2024 | Associated partner | EUR 0 |
| AI4REALNETAI for REAL-world NETwork operation | HORIZON | 2023 | Associated partner | EUR 0 |
| CLUG 2.0CLUG Demonstration of Readiness for Rail | HORIZON | 2023 | Participant | EUR 0 |
| IN2TRACK3IN2TRACK3 | H2020 | 2021 | Participant | EUR 0 |
| 5GRAIL5G for future RAILway mobile communication system | H2020 | 2020 | Participant | EUR 78,350 |
| X2Rail-5Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security | H2020 | 2020 | Participant | EUR 70,695 |
| FR8RAIL IVUse-centric rail freight innovation for Single European Railway Area. | H2020 | 2020 | Participant | EUR 78,416 |
| X2Rail-4Advanced signalling and automation system - Completion of activities for enhanced automation systems, train integrity, traffic management evolution and smart object controllers | H2020 | 2019 | Participant | EUR 19,721 |
| IN2SMART2Intelligent Innovative Smart Maintenance of Assets by integRated Technologies 2 | H2020 | 2019 | Participant | EUR 39,996 |
| CLUGCERTIFIABLE LOCALISATION UNIT WITH GNSS IN THE RAILWAY ENVIRONMENT | H2020 | 2019 | Participant | EUR 102,970 |
| X2Rail-3Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication | H2020 | 2018 | Participant | EUR 0 |
| X2RAIL-2Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functions | H2020 | 2017 | Participant | EUR 19,554 |
| FR8HUBReal time information applications and energy efficient solutions for rail freight | H2020 | 2017 | Participant | EUR 13,176 |
| IN2SMARTIntelligent Innovative Smart Maintenance of Assets by integRated Technologies | H2020 | 2016 | Participant | EUR 0 |
| FR8RAILDevelopment of Functional Requirements for Sustainable and Attractive European Rail Freight | H2020 | 2016 | Participant | EUR 0 |
| IN2TRACKResearch into enhanced tracks, switches and structures | H2020 | 2016 | Participant | EUR 0 |
| X2Rail-1Start-up activities for Advanced Signalling and Automation Systems | H2020 | 2016 | Participant | EUR 0 |
| D-RAILDevelopment of the Future Rail Freight System to Reduce the Occurrences and Impact of Derailment | FP7 | 2011 | Participant | EUR 46,817 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.