EDFFP7H2020HORIZON
Isd Lyseis Olokriromenon Systimatonanonymos Etaireia
- Country
- GRGreece
- Defence projects
- 17
- Projects, all programmes
- 41
- As coordinator
- 1
- EU contribution (CORDIS)
- EUR 4,225,357
- Active
- 2009 to 2025
Projects
41 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| ABYSSAAdvanced Breakthrough sYstems for SubSea Autonomy | EDF | 2025 | Participant | Not stated |
| E-DOMINIONEuropean – Digitalization Of Maritime Innovation for Naval Integrated Platforms and COmbat Cloud Nodes | EDF | 2025 | Participant | Not stated |
| LATACC2LAnd TActical Collaborative Combat Phase 2 | EDF | 2025 | Participant | Not stated |
| FAMOUS3European Future Highly Mobile Augmented Armoured Systems 3 | EDF | 2025 | Participant | Not stated |
| EURECAEUropean REsilient Chiplet Architecture | EDF | 2025 | Participant | Not stated |
| SHARPSovereign High-performance Architecture for Rotorcraft Propulsion | EDF | 2025 | Participant | Not stated |
| SPIDER2Space-based Persistent ISR for Defence and Europe Reinforcement - phase 2 | EDF | 2025 | Participant | Not stated |
| NeAIxtNext Generation of edge AI crossing technology fields | HORIZON | 2025 | Participant | Not stated |
| EDF2024-EPW-Phase2European Protected Waveform (Phase 2) | EDF | 2024 | Participant | Not stated |
| NEREUSNaval systEm of systems and integRatEd sUrvivability of future EU platformS | EDF | 2024 | Participant | Not stated |
| ePERFECTEuropean High-Performance Processor for RF Defense Applications | EDF | 2024 | Coordinator | Not stated |
| AI-WASPArtificial Intelligence Warfare Adaptive Swarm Platform | EDF | 2024 | Participant | Not stated |
| iMUGS2Integrated Modular Unmanned Ground System 2 | EDF | 2024 | Participant | Not stated |
| AURIGAArmoURed Infantry Ground Assault | EDF | 2024 | Participant | Not stated |
| ENGRT IIEuropean Next Generation Rotorcraft Technologies Phase II | EDF | 2024 | Participant | Not stated |
| ATHENAAdvanced Technologies for High value imagiNg Applications | HORIZON | 2024 | Participant | EUR 439,093 |
| ESOCAEuropean System for Outsized Cargo Airlift (ESOCA) | EDF | 2023 | Participant | Not stated |
| SCOPSScallable COntroller for Power Sources | HORIZON | 2023 | Participant | EUR 594,069 |
| E-NACSOSEU NAval Collaborative Surveillance Operational Standard | EDF | 2022 | Participant | Not stated |
| FASETTFuture Air System for European Tactical Transportation | EDF | 2022 | Participant | Not stated |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.European Defence Fund participants are read from the project factsheets that DG DEFIS publishes, by a language model; every name is checked against the factsheet text and a name that is not in it is dropped. The factsheets state no amount per participant.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.